
Natural Alternatives Incorporated
60,000 square foot manufacturing remodel in Vista, California
Directed Electronics Inc.
196,000 square foot office building in Vista, California
Qualcomm Building A T.I.
10,000 Remodel of existing office building in San Diego, California
Qualcomm Building AI Shower & Locker Room T.I.
5,000 square foot remodel of existing shower & locker rooms in San Diego,
California
pH Neutralization Pepsi Bottling
Replace process piping for bottling facility in San Diego, California
Quantum Focus Instruments Corp
3,582 square foot office building located in Vista, California
SPAWAR
Fabricate and install HVAC skid to be attached to a satellite antenna container
located in Iraq for the USMC
ViaSat Bldg 6
67,200 square feet government contractor
ViaSat
Various tenant improvements
Callaway Golf
10,000 square foot tenant improvement and parking structure located in Carlsbad,
California
3M Molded Devices
Process controls for manufacture of Littmann stethoscopes
Biopac Systems, Inc.
25,000 sq. ft. office building located in Santa Barbara California